Trambrug Edam

The Tram bridge in Edam is a drawbridge built in 1921. The renovation work was completed in April 2020, taking into account the protection of historic monuments. The bridge is equipped with one of our low-maintenance and environmentally friendly electromechanical ADE actuator.
Bridge deck actuator: MSK 100, stroke 900 mm, static tansile force 480 kN, static compressive force 450 kN
Link to the news of our representative ATB: https://atbautomation.eu/nl/toepassingen/106-referentieproject-ade-trambrug-edam.html
