References
with ADE electric linear actuators
… since 1996.
Thionville lockage (Canal de la Moselle, France)
5 Mitred gate drives UH/LH 59kN/1230mm
5 circulation sluice drives LH 70kN/1030mm
Delivery May 2020
Thionville lockage (Canal de la Moselle, France)
5 Mitred gate drives UH/LH 59kN/1230mm
5 circulation sluice drives LH 70kN/1030mm
Delivery May 2020
Wildegg / Brugg Hydropower plant (Aare, Schweiz)
1 Flushing gate drive 64kN/530mm
Delivery October 2019
Implementation 2019
Witzeese lockage (Elbe-Lübeck-Canal, Schleswig-Holstein)
1 Mitred gate drives 80kN/2000mm
Delivery October 2019
Implementation 2019
Keersluis Laaksche Vart lockage (Netherlands)
8 Mitred gate drives 30kN/1900mm
Delivery October 2019
Implementation 2019
Keersluis Leursche Haven lockage (Netherlands)
8 Mitred gate drives 30kN/1900mm
Delivery October 2019
Implementation 2019
Hirschhorn lockage (Neckar, Hessen)
Right chamber Upper head/Lower head
4 Mitred gate drives 450kN/1800mm
4 Segment gate drives 140kN/420mm
Delivery March 2020
Caledonian Canal lockage (Great Glen, Scottland)
20 Mitred gate drives 105kN/2100mm
Delivery January 2020
Tacen – Kanutrail hydropower plant (Save, Slowenien)
1 Sluice drive 50kN/2550mm
Delivery July 2019
Implementation 2019
Oranjesluizen fish pass (Amsterdam, Netherlands)
1 Sluice drive 50kN/2550mm
Delivery July 2019
Implementation 2019
Oberndorf flood control reservoir (Rudersberg / Baden-Württemberg)
1 Radial gate drive 280kN/1700mm
1 Fishbellied flaps 230kN/1900mm
Delivery 2020
Tuxbach hydropower plant (Finkenberg, Austria)
1 Regulation flap drive 35kN/1780mm
1 Regulation flap drive 35kN/2530mm
Delivery May 2019
Implementation 2019
Grand-Carré lockage (Canal de la Deûle / France)
5 Mitred gate drives 250kN/2600mm
5 Sluice drives 185kN/2900mm
Delivery June 2019
Implementation 2019
Leeghwatersluis lockage (Amere - Netherlands)
4 Mitred gate drives 17kN/1080mm
4 Sluice drives 4kN/ 630mm
Delivery December 2018
Implementation 2019
Meldorf flood barrier (Meldorfer Hafen – Schleswig-Holstein)
6 Mitred gate drives 785kN/1400mm
Delivery April 2019
Implementation 2019
Reevediepschutsluis flood barrier (Drontermeer - Netherlands)
7 Sluice drives 40kN/1100mm
Delivery February 2019
Implementation 2019
Sølbergfallet hydropower plant (Orkland – Norway)
1 Sluice drive inlet structure 36kN/1530mm
Delivery August 2018
Implementation 2018
HWS Ipswich flood barrier (Hafen Ipswich - England)
2 Mitred gate drives 70kN/1370mm
Delivery October 2018
Implementation 2018
Hals hydropower plant (Ilz, Bayern)
2 Sluice drives bottom outlet 420kN/3700mm
Delivery July 2018
Implementation 2018
Anderten Westkammer lockage (Mittelland canal, Lower Saxony)
2 Sluice drives LH/UH 200kN/2900mm
Delivery May 2018
Implementation 2018
Bad Karlshafen lockage (RLHr, North Rhine-Westphalia)
4 Sluice drives 25kN/530mm
4 Mitred gate drives 80kN/530mm
Delivery 2018
Implementation 2019
Niederpöbel flood control reservoir (Pöbeltal / Saxony)
2x2 Sluice drives 293kN/5100mm
2x2 Sluice drives 239kN/4700mm
Delivery 2018
Implementation 2019
Malliß weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
2 drive Fishbellied flaps 424kN/4700mm
2 Sluice drives fish passage 11kN/1130mm
2 Sluice drives fish passage 6kN/ 830mm
Delivery 2018
Implementation 2019
Don lockage (canal de la Deûle / France)
3 segment gate operator 520kN/2815mm
3 Mitred gate drives 241kN/2600mm
9 Sluice drives 50kN/ 530mm
Delivery January 2018
Implementation 2018
Wanne-Eickel BA2 lockage (Dortmund - Ems Canal / North Rhine-Westphalia)
2 Sluice drives 365kN/3150mm
Delivery June 2020
Wanne-Eickel BA1 lockage (Dortmund - Ems Canal / North Rhine-Westphalia)
2 Sluice drives 365kN/3150mm
Delivery January 2020
Henrichenburg BA2 lockage (Dortmund - Ems Canal / North Rhine-Westphalia)
4 Sluice drives 365kN/3150mm
Delivery April 2019
Implementation 2019
Henrichenburg BA1 lockage (Dortmund - Ems Canal / North Rhine-Westphalia)
4 Sluice drives 365kN/3150mm
Delivery October 2018
Implementation 2018
Swing Bridge Hitzacker (Hitzacker / Lower Saxony)
1 Drive swing bridge 100kN/2300mm
2 Excenter-bearing 100kN/430mm
1 Bascule bridge top bolt 10kN/180mm
Delivery October 2018
Implementation 2020
Herne-Ost Nordkammer lockage (Dortmund - Ems Canal / North Rhine-Westphalia)
6 Sluice drives 365kN/3150mm
Delivery March 2018
Implementation 2018
Herne-Ost Südkammer lockage (Dortmund - Ems Canal / North Rhine-Westphalia)
4 Sluice drives 365kN/3150mm
Delivery December 2017
Implementation 2018
Neubrück weir system (Spree, Brandenburg)
2 drive, Fishbellied flaps 430kN/4300mm
Delivery August 2017
Implementation 2018
Pumping station Gemaal Vijfhuizen (Hallum, Holland)
5 Emergency gate drive 30kN/1630mm
3 Regulation gate drive 30kN/1630mm
Delivery January 2018
Implementation 2018
Dam Nederrijn en Lek (Nederrijn, Holland)
12 Sluice drives 108kN/2100mm
Delivery ab 2017
Implementation ab 2017
Dam reservoir Ratscher (Sluice, Thüringen)
4 scour - Sluice drives 200kN/2100mm
Delivery November 2016
Implementation 2017
Stiftsmühle lockage (RLHr, North Rhine-Westphalia)
2 Sluice drives 10kN/830mm
2 Mitred gate drives 44kN/1230mm
Delivery October 2016
Implementation 2017
Kleinmachnow lockage (Teltow canal, Berlin)
2 Sluice drives 79kN/2050mm
Delivery July 2016
Implementation 2016
Zerben lockage (Elbe-Havel Canal / Brandenburg)
5 circulation sluice drives 471kN/3300mm
6 Mitred gate drives 575kN/1950mm
Delivery July 2016
Implementation 2018
Leidschendam lockage (Rijn-Schiekanaal, Holland)
6 Sluice drives 5kN/1150mm
Delivery April 2016
Implementation 2016
Harelbeke lockage (Leie, Belgium)
19 Sluice drives 39kN/1450mm
Delivery starting April 2016
Implementation starting 2016
Saldernhorst weir system (Dosse, Brandenburg)
2 drives, fishbellied flaps 400kN/4000mm
Delivery Februaryy 2016
Implementation 2017
Fürstenberg weir system (Havel-Wasserstrasse, Brandenburg)
2 drives, fishbellied flaps 270kN/2500mm
Delivery Februaryy 2016
Implementation 2016
Rosenbeck weir system (Werbellin canal, Brandenburg)
1 sluice drive 20kN/ 850mm
Delivery November 2015
Implementation 2016
Ameland lockage (Holland)
2 sluice drives 30kN/1630mm
Delivery Januaryy 2016
Implementation 2016
Oudewater lockage (Holland)
2 gate drives 10kN/ 800mm
2 gate drives 9kN/1150mm
2 sluice drives 6kN/ 630mm
Delivery December 2015
Implementation 2016
Neckar lockage (Neckar, Baden Württemberg)
Upper head/Lower head
18 Mitred gate drives 450kN/1800mm
16 Segment gate drives 160kN/ 420mm
Delivery February 2016
Implementation ab 2016
Miedema Gemaal lockage (Holland)
1 Sluice drive 20kN/ 980mm
Delivery July 2015
Implementation 2016
Emspier dolphin berth (Emden / Lower Saxony)
2 Ro-Ro berth drives 700kN/7740mm
Delivery November 2015
Implementation December 2015
Barrage du Joux weir system (La Turdine / France)
1 segment flap drive 150kN/1250mm
Delivery April 2015
Implementation 2015
New Niederfinow ship lift (Oder-Havel-Canal, Brandenburg)
8 drives trough holding device 5kN/1030mm
Delivery 2016
Beatrixsluis lockage (Almere, Holland)
4 Mitred gate drives 17kN/1080mm
4 Sluice drives 4kN/ 630mm
Delivery February 2015
Implementation 2015
Tussensluis lockage (Hoge Vaart Almere, Holland)
4 Mitred gate drives 41kN/1900mm
4 Sluice drives 4kN/ 630mm
Delivery February 2015
Implementation 2015
Lower lock Berlin weir system (Landwehr canal, Berlin)
Drive, fishbellied flap 75kN/1900mm
Delivery March 2015
Implementation 2015
Barrage des Lorraines weir system (Rivière Allier / France)
2 drives fishbellied flaps 700kN/3500mm
Delivery October 2014
Implementation 2015
Lower and upper weir of Zerben (Elbe-Havel canal / Brandenburg)
2 drives, Fishbellied flaps 300kN/2400mm
Delivery August 2014
Implementation 2015
Zerpenschleuse lockage (Langer Trödel, Brandenburg)
Head gate / aft gate
4 Mitred gate drives 58kN/1530mm
4 Sluice drives 31kN/850mm
Delivery November 2014
Implementation 2016
Voßwinkel lockage (Obere Havel Waterway, Mecklenburg-Western Pomerania)
Head gate/Aft gate
4 Mitred gate drives 30kN/1530mm
4 Sluice drives 20kN/850mm
Delivery February 2015
Implementation 2015
Lockage lock link canal 1 (Spreetaler-/Sabrodter See, Saxony)
LH/LH
2 Mitred gate drives 40kN/1530mm
2 sluice gate drives 30kN/ 980mm
Delivery March 2014
Hessigheim lockage (Neckar, Baden Württemberg)
Right chamber of upper head / lower head
6 Mitred gate drives 450kN/1800mm
6 Segment gate drives 140kN/420mm
Delivery May 2014
Implementation 2016
Petershagen lockage (Weser sluice channel, North Rhine Westphalia)
5 Mitred gate drives 280kN/2700mm
Delivery May 2014
Implementation 2014
Findenwirunshier lockage (Müritz-Elde waterway, Mecklenburg-West Pomerania)
LH/LH
4 Mitred gate drives LH/LH 53kN/1530mm
4 sluice gate drives LH/LH 32kN/950mm
Delivery February 2014
Implementation 2014
Henne Reservoir weir system (RLHr, North Rhine Westpahlia)
1 Flap drive 140kN/2900mm
Delivery February 2014
Implementation 2014
Poelsluis lockage (Zaan - Polder Wormer, Holland)
2 Sluice drives 3kN/630mm
Delivery November 2013
Implementation 2014
Wolfsbruch lockage (Hüttencanal, Brandenburg)
Head gate/Aft gate
4 Mitred gate drives 30kN/1530mm
4 roll wedge drives 25kN/850mm
Delivery Januaryy 2014
Implementation 2014
Obertürkheim lockage (Neckar, Baden Württemberg)
Right chamber upper head/lower head
4 Mitred gate drives 450kN/1800mm
4 Segment gate drives 140kN/420mm
Delivery April 2014
Implementation 2016
Wüstenhausen flood control reservoirs (Ilsfeld, Baden-Württemberg)
1 Flap drive 75kN/1580mm
Delivery June 2013
Implementation 2014
Comblain_au_Pont weir system (Belgium)
1 Flap drive 25kN/1630mm
Delivery June 2013
Implementation 2014
Metz lockage (Canal de la Moselle, France)
5 Mitred gate drives LH/LH 59kN/1230mm
5 circulation sluice drives LH 70kN/1030mm
Delivery May 2013
Implementation 2014
Ryburg-Schwörstadt fish pass (Rhine, Switzerland)
1 swing gate drive 200kN/2200mm
Delivery June 2013
Implementation 2014
Goejanverwellesluis lockage (Hollandse IJssel, Holland)
2 Sluice drives 12kN/2200mm
1 Sluice drive 5kN/ 930mm
Delivery May 2013
Implementation 2015
Beeskow lockage (Spree, Brandenburg)
LH/UH
4 Mitred gate drives 30kN/1530mm
4 Sluice drives 25kN/980mm
Delivery 2013
Implementation 2013
2. Julyanasluis lockage (Hollandse IJssel, Holland)
12 Sluice drives 50kN/1530mm
Delivery 2013
Implementation 2014
Hechtsforth lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
2 Mitred gate drives LH 30kN/1530mm
2 Sluice drives LH 32kN/980mm
2 Sluice drives UH 32kN/1250mm
1 Flap gate drive UH 133kN/2600mm
Delivery March 2013
Implementation 2013
Geesthacht lockage (Elbe, Schleswig-Holstein)
UH flap valve
2 locking drives 80kN/900mm
Delivery November 2012
Implementation 2014
Lockage lock link canal 12 (Senftenberger-/Geierswalder See, Saxony)
LH/UH
2 Mitred gate drives 30kN/1530mm
2 sluice gate drives 20kN/850mm
Delivery November 2012
Riensluis Lemmer lockage (Spuilock, Holland)
4 Mitred gate drives 60kN/2050mm
4 Sluice drives 15kN/ 730mm
1 locking drive 15kN/ 430mm
Delivery July 2012
Implementation 2012
Richemont lockage (Canal de la Moselle, France)
4 Mitred gate drives UH/LH 59kN/1230mm
4 circulation sluice drives LH 70kN/1030mm
Delivery May 2012
Implementation 2012
Lockage Minden Weser lock (Weser, Lower Saxony)
2 Mitred gate drives (UT) 300kN/2800mm
1 swivelling segment gate drive (HG) 1150kN/2900mm
1 locking drive (HG) 11kN/ 300mm
4 circulation slucie drives 380kN/2200mm
6 saving basin lock drives 380kN/2200mm
Delivery 2014
Wusterwitz lockage (Elbe-Havel canal / Brandenburg)
4 circulation sluice drives 410kN/3300mm
4 Mitred gate drives 575kN/1950mm
Delivery August 2012
Hüntel lockage (Dortmund - Ems canal / North Rhine-Westphalia)
4 cylindrical sluice drives 137kN/ 730mm
4 Mitred gate drives 302kN/2900mm
4 abutment beam locking actuators 8kN/ 190mm
Delivery 2013
Implementation 2013
Hilter lockage (Dortmund - Ems canal / North Rhine-Westphalia)
4 Sluice drives 137kN/730mm
4 abutment beam locking actuators 8kN/190mm
Delivery Januaryy 2012
Implementation 2013
Düthe lockage (Dortmund - Ems canal / North Rhine-Westphalia)
4 Sluice drives 137kN/730mm
4 abutment beam locking actuators 8kN/190mm
Delivery Januaryy 2012
Implementation 2012
Kleinmachnow weir system (Teltow canal, Berlin)
1 slide gate drive 50kN/2550mm
Delivery December 2011
Implementation February 2012
Talange lockage (Canal de la Moselle, France)
5 Mitred gate drives UH/LH 59kN/1230mm
5 circulation sluice drives LH 70kN/1030mm
Delivery August 2011
Implementation January 2012
Kersdorf lockage (Oder-Spree-canal, Brandenburg)
2 Mitred gate drives (AG) 130kN/2000mm
1 Swivelling segment gate drives (HG) 1600kN/2100mm
1 locking drive HG 10kN/ 280mm
4 sluice gate drives AG 80kN/1150mm
2 abutment beam drives 100kN/2900mm
4 abutment beam locking drives 10kN/ 280mm
Delivery end of 2011 UH / December 2012 LH
Implementation 2013
Weir system 14 Schmogrow (Langer Fließ, Brandenburg)
1 drive, Fishbellied flaps 250kN/2500mm
Delivery August 2011
Implementation 2011
Canoe Park lock in Markleeberg (Markleeberger lake, Saxony)
2 Mitred gate drives LH 15kN/1800mm
1 cheek gate drive UH 30kN/1800mm
2 sluice gate drives LH 25kN/880mm
Delivery 2011
Dörverden lockage (Mittelweser, Lower Saxony)
3 Mitred gate drives (UT) 280kN/2650mm
3 Swivelling segment gate drives (OT) 1500kN/2900mm
1 Locking drive HG 20kN/250mm
2 circulation sluice drives 320kN/2650mm
2 abutment beam drives 210kN/850mm
2 abutment beam locking drives 30kN/300mm
Delivery starting November 2012
Implementation 2013
Gimritz lockage (Saale, Saxony-Anhalt)
4 Mitred gate drives UH/LH 24kN/1530mm
2 sluice gate drives LH 35kN/1250mm
Delivery May 2011
Implementation 2011
Planena lockage (Saale, Saxony-Anhalt)
4 Mitred gate drives UH/LH 24kN/1530mm
2 sluice gate drives LH 35kN/1250mm
Delivery May 2011
Implementation 2011
Hoftal flood control reservoirs (Bottwar, Baden-Württemberg)
4 Sluice drives (operating outlet) 70kN/1550mm
2 Sluice drives (bottom outlet) 70kN/3150mm
2 drive, Fishbellied flaps 75kN/1900mm
Delivery 2011
Implementation 2012
Artern lockage (Unstrut, Thüringen)
Head gate/Aft gate
4 slide gate drives 20kN/830mm
Delivery March 2011
Implementation May 2011
Filling HWS Bayreuth (Bayreuth, Bayern)
1 Sluice drive 110kN/1050mm
1 locking drive 40kN/130mm
Delivery March 2011
Implementation 2012
Bobzin lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
2 Mitred gate drives LH 30kN/2450mm
4 Sluice drives LH/UH 75kN/1530mm
1 Flap gate drive UH 120kN/2600mm
Delivery March 2011
Implementation May 2011
Bolzum lockage (Hildesheim branch canal – Lower Saxony)
3 Mitred gate drives (LH) 512kN/2150mm
3 Swivelling segment gate drives (UH) 918kN/2150mm
3 circulation sluice drives 370kN/2000mm
Delivery 2011
Implementation October 2012
Koblenz 2 lockage (Mosel, Rhineland-Palatinate)
2 Segment gate drives 140kN/420mm
Delivery November 2010
Implementation 2011
Lockage Connewitzer Weir (Junction canal Leipzig-Cosputener See, Saxony)
2 cheek gate drives LH/UH 30kN/1850mm
Delivery June 2010
Rischmühle lockage (Saale, Saxony-Anhalt)
4 Mitred gate drives LH/UH 24kN/1530mm
4 circulation sluice drives LH/UH 35kN/1250mm
Delivery May 2010
Implementation May 2010
City of Halle lockage (Saale, Saxony-Anhalt)
4 Mitred gate drives UH/LH 24kN/1530mm
2 sluice gate drives LH 35kN/1250mm
Delivery May 2010
Implementation May 2010
Malchow weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
2 drives, Fishbellied flaps 425kN/4200mm
Delivery March 2011
Implementation 2014
Güritz weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
2 drives, Fishbellied flaps 465kN/5300mm
Delivery March 2011
Implementation 2014
Lewitz lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
LH/UH
4 Mitred gate drives UH/LH 53kN/1530mm
4 sluice gate drives UH/LH 31kN/950mm
Delivery February 2010
Implementation May 2010
Garde de Deluz lockage (Canal du Rhone au Rhin, France)
UH/LH
4 Mitred gate drives 20kN/1200mm
Delivery June 2010
Implementation 2011
Lockage lock link canal 6 (Neuwieser-/Partwitzer See, Saxony)
LH/UH
2 Mitred gate drives 30kN/1530mm
2 sluice gate drives 20kN/850mm
Delivery December 2010
Fürstenberg lockage (Havel waterway, Brandenburg)
LH/UH
4 Mitred gate drives 30kN/1530mm
4 sluice gate drives 20kN/800mm
Delivery February 2010
Implementation May 2010
Lindenau weir system (Pulsnitz, Brandenburg)
1 drives, Fishbellied flaps 390kN/3000mm
Delivery September 2009
Implementation September 2009
Lauenburg weir system (Elbe-Lübeck-Canal, Schlesig-Holstein)
1 drive, Fishbellied flaps 425kN/4200mm
Delivery September 2009
Implementation May 2010
Neustadt-Glewe weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
2 drive, Fishbellied flaps 203kN/4500mm
Delivery August 2009
Implementation September 2009
Anderten lockage (Mittelland canal, Lower Saxony)
5 Sluice drives LH/UH 200kN/2900mm
Delivery December 2009
Implementation April 2010
Guttenbach lockage (Neckar, Baden Württemberg)
Right chamber Upper head/Lower head
4 Mitred gate drives 300kN/1800mm
4 Segment gate drives 140kN/420mm
Delivery November 2010
Implementation 2011
New Niederfinow ship lift (Oder-Havel-Canal, Brandenburg)
10 Swivelling segment gate drives 650kN/2670mm
8 Swivelling segment locking drives 10kN/450mm
18 pressure frame drives 140kN/300mm
2 drive Hilfstor 116kN/2400mm
2 locking drive security gate 4kN/400mm
Delivery starting 2014
Duisburg-Meiderich lockage (Rhein-Herne-Canal, North Rhine-Westphalia)
4 Sluice drives LH/UH 200kN/3300mm
Delivery September 2008
Implementation April 2010
Brieskow-Finkenheerd dyke (Oder, Brandenburg)
2 Mitred gate drives 130kN/2000mm
Delivery 2009
Implementation October 2009
Brandshof dyke (Lower Bille, Hamburg)
1 Sluice drive - sluive 110kN/2800mm
1 Sluice drive - Bille 110kN/2200mm
1 Sluice drive - HWS 110kN/4000mm
Delivery February 2009
Implementation November 2009
Geiseltalsee weir system (Lake Geiseltal, Saxony-Anhalt)
1 drive, Fishbellied flaps 340kN/3200mm
Delivery 2009
Implementation September 2009
Belley lockage (Haut-Rhône, France)
4 Mitred gate drives 218kN/3300mm
Delivery July 2009
Implementation 2011
Chautagne lockage (Haut-Rhône, France)
5 Mitred gate drives 218kN/3300mm
Delivery December 2008
Implementation 2011
Gleesen lockage (Dortmund - Ems Canal, North Rhine-Westphalia)
Aft gate/Head gate
2 Mitred gate drives LH 160kN/3000mm
4 circulation sluice drives LH/UH 134kN/600mm
1 Flap gate drive UH 104kN/6500mm
Delivery July 2009
Implementation November 2009
Hesselte lockage (Dortmund - Ems Canal, North Rhine-Westphalia)
Aft gate/Head gate
2 Mitred gate drives LH 160kN/3000mm
4 circulation sluice drives LH/UH 134kN/600mm
1 Flap gate drive UH 104kN/6500mm
Delivery July 2009
Implementation November 2009
Rodde lockage (Dortmund - Ems Canal, North Rhine-Westphalia)
Aft gate/Head gate
2 Mitred gate drives LH 160kN/3000mm
4 circulation sluice drives LH/UH 134kN/600mm
1 Flap gate drive UH 104kN/6500mm
Delivery July 2009
Implementation November 2009
Venhaus lockage (Dortmund - Ems Canal, North Rhine-Westphalia)
Aft gate/Head gate
2 Mitred gate drives LH 160kN/3000mm
4 circulation sluice drives LH/UH 134kN/600mm
1 Flap gate drive UH 104kN/6500mm
Delivery July 2009
Implementation November 2009
Bevergern lockage (Dortmund - Ems Canal / North Rhine-Westphalia)
Aft gate/Head gate
2 Mitred gate drives LH 160kN/3000mm
4 circulation sluice drives LH/UH 134kN/600mm
1 Flap gate drive UH 104kN/6500mm
Delivery July 2009
Implementation November 2009
Lockage of Evergem 2nd Sluis (Ringvaart Noord, Belgium)
37 Sluice drives 150kN/1600mm
Delivery December 2008
Implementation June 2009
Spitalberg flood control reservoir Offenburg (Baden-Württemberg)
2 drives, Fishbellied flaps 80kN/930mm
Delivery January 2008
Implementation June 2008
Spandau citadel weir (Havel, Berlin)
1 drive Fishbellied flaps 160kN/2500mm
Delivery January 2008
Implementation June 2008
Klingenberg dam (Wilde Weißeritz, Saxony)
2 Sluice drives 150kN/2100mm
Delivery December 2007
Implementation November 2008
Eldena lockage (Müritz-Elde waterway Mecklenburg-Western Pomerania)
Aft gate/Head gate
4 Mitred gate drives UH/LH 30kN/37kN/1530mm
4 sluice gate drives UH/LH 28kN/950mm
Delivery February 2008
Implementation April 2008
Landing stages of St. Pauli (Elbe, Hamburg)
8 flood-control gate drives 150kN/2100mm
8 locking actuators 4kN/180mm
Delivery December 2007
Implementation August 2009
Brienen lockage (Spoycanal, North Rhine-Westphalia)
2 Sluice drives 50kN/2100mm
Delivery February 2008
Implementation May 2008
Bischofwerder lockage (Vosscanal, Brandenburg)
Head gate/Aft gate
4 Mitred gate drives 110kN/2000mm
4 Sluice drives 20kN/850mm
Delivery December 2007
Implementation April 2008
Barrage de la Tuilières weir system (Dordogne / France)
1 Sluice drive 276kN/1750mm
Delivery April 2008
Implementation June 2009
Baldeneysee lockage (RLHr, North Rhine-Westphalia)
2 lift gate drives UH 185kN/4500mm
Delivery January 2008
Implementation November 2008
Upper lock Minden lockage (connection channel from south, Minden – Lower Saxony)
Flap gate drive UH 150kN/6300mm
Delivery Febraur 2008
Implementation August 2008
Altenrheine lockage (Dortmund - Ems Canal / Nordrhein - Westfalen)
Lower head
2 abutment beam drives 110kN/2100mm
Delivery October 2007
Implementation January 2008
Barrage de la Tuillières weir system (Dordogne, France)
4 Sluice drives 195kN/1000mm
Delivery October 2007
Implementation June 2008
Stiftsmühle lockage (RLHr, North Rhine-Westphalia)
Flap gate drive UH 110kN/900mm
Delivery August 2007
Implementation August 2009
Hademstorf lockage (Aller, Lower Saxony)
4 Sluice drives 40kN/1850mm
Delivery April 2007
Implementation April 2007
Diez lockage (Lahn, Rheinland-Pfalz)
Head gate/Aft gate
4 Mitred gate drives 100kN/1550mm
4 Sluice drives 32kN/1050mm
Delivery November 2007
Limburg lockage (Lahn, Hessen)
Head gate/Aft gate
4 Mitred gate drives 100kN/1550mm
4 Sluice drives 32kN/1050mm
Delivery November 2007
Heegermühle weir system (Finow canal, Brandenburg)
1 drive, Fishbellied flaps 340kN/3770mm
Delivery November 2007
Implementation April 2008
Malliß weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
Aft gate/Head gate
4 Mitred gate drives UH/LH 30kN/1530mm
4 sluice gate drives UH/LH 28kN/950mm
Delivery February 2007
Implementation April 2007
Hannover-Limmer lockage (Leine Abstiegsschleuse, Lower Saxony)
8 sluice gate drives lower-/upper head 30kN/180mm
4 Mitred gate drives 195kN/4500mm
Delivery February/March 2007
Implementation April 2007
Neckarsteinach lockage (Neckar, Baden Württemberg)
Right chamber of Upper head/Lower head
6 Mitred gate drives 300kN/1800mm
5 Segment gate drives 140kN/420mm
Delivery June 2007
Implementation November 2007
Liebenwalde lockage (Malzer Canal, Brandenburg)
Head gate/Aft gate
4 Mitred gate drives 110kN/2000mm
4 Sluice drives 20kN/850mm
Delivery December 2006
Implementation April 2007
Bredereiche lockage (Havei waterway, Brandenburg)
Aft gate
2 Mitred gate drives 30kN/1530mm
2 Segment gate drives 20kN/800mm
Delivery December 2006
Implementation April 2007
Bollingerfähr lockage (Dortmund - Ems Canal / North Rhine-Westphalia)
4 Sluice drives 100kN/730mm
2 abutment beam locking actuators 8kN/190mm
Delivery October 2007
Implementation June 2007
Varloh lockage (Dortmund - Ems Canal / North Rhine-Westphalia)
4 Sluice drives 100kN/730mm
2 abutment beam drives 110kN/2200mm
4 abutment beam locking actuators 8kN/190mm
Delivery October 2006
Implementation February 2007
Ortrand weir system (Pulsnitz, Brandenburg)
Drive Fishbellied flaps 210kN/2800mm
Delivery August 2006
Implementation September 2006
Möhnetalsperre Vordamm Heve
2 Sluice drives 80kN/1520mm
Delivery October 2006
Implementation 2007
Mulhouse lockage no. 41 (Canal du Rhone au Rhin, France)
Head gate
2 Mitred gate drives 50kN/1300mm
Delivery March 2006
Implementation June 2006
Plau lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
Aft gate/Head gate
4 Mitred gate drives UH/LH 30kN/1530mm
4 sluice gate drives UH/LH 28kN/950mm
Delivery February 2006
Implementation April 2006
Lewitz weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
2 drives, Fishbellied flaps 425kN/4645mm
Delivery March 2006
Implementation August 2008
Meppen lockage (Dortmund-Ems-Canal / Lower Saxony)
5 saving basin drives 90kN/2400mm
1 tilting drive 75kN/400mm
Delivery April 2006
Implementation December 2006
Hameln lockage (Weser / Lower Saxony)
Upper-/middle-/lower head
6 Mitred gate drives 145kN/3100mm
6 Sluice drives 248kN/3100mm
Delivery April 2006
Implementation ab June 2006
Quimperlé weir system (l'Isole/Bretagne / France)
1 drive weir flap 616kN/2200mm
Delivery November 2005
Implementation November 2005
Rathenow main lockage (Lower Havel / Brandenburg)
Upper-/lower head
4 Mitred gate drives 80kN/2000mm
4 circulation sluice drives 80kN/2000mm
Delivery February 2006
Implementation May 2006
Lockages at the Canal des Houillères de la Sarre (France)
Aft gate/Head gate
60 Mitred gate drives 20kN/1200mm
Delivery December 2005 bis March 2007
Implementation ab March 2006
Wernsdorf lockage (Oder-Spree-Canal, Berlin)
Aft gate/Head gate north chamber
2 Mitred gate drives LH 130kN/2000mm
2 circulation sluice drives UH 80kN/1600mm
1 Flap gate drive UH 150kN/5500mm
Delivery January 2006
Implementation November 2006
Eichhorst lockage (Werbellin canal, Brandenburg)
Head gate/Aft gate
4 Mitred gate drives 30kN/1530mm
4 roll wedge drives 10kN/850mm
Delivery January 2006
Implementation April 2006
Cospuden lockage (Cospudener See, Saxony)
Head gate/Aft gate
2 cheek gate drives 25kN/1530mm
2 slide gate drives 6kN/530mm
Delivery December 2005
Implementation July 2006
Hollage und Haste lockage (Osnabrück branch canal, Lower Saxony)
5 sluive gate drives 40kN/700mm
Delivery December 2005
Implementation 2006
Münster lockage (Dortmund - Ems Canal / North Rhine-Westphalia)
2 ciruclation sluice drives LH 180kN/2560mm
Delivery August 2005
Implementation November 2005
Essen-Kettwig lockage (RLHr; North Rhine-Westphalia)
2 locking actuators for lifting gate UH 4kN/130mm
Delivery March 2005
Implementation April 2005
South Offenbach lockage (Mayn; Hessen)
7 Sluice drives LH/MH/UH 130kN/560mm
Delivery June 2005
Implementation ab May 2006
Upper lock Minden lockage (connection channel from south, Minden – Lower Saxony)
2 Mitred gate drives LH 120kN/2100mm
Delivery May 2005
Implementation May 2005
Sülfeld lockage (Mittelland canal – Lower Saxony)
5 mitred gate - (LH)/ swivelling segment gate - (UH)
Drives 857kN/2150mm
10 saving basin / axial canal lock drives 326kN/1905mm
Delivery 2008
Implementation November 2008
Parchim lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
2 Mitred gate drives LH 30kN/1530mm
2 sluice gate drives LH 28kN/950mm
2 locking actuators for lifting gate UH 10kN/30mm
Delivery February 2005
Implementation April 2005
Artern lockage (Unstrut, Thüringen)
Head gate/Aft gate
4 Mitred gate drives 15kN/1530mm
4 slide gate drives 6kN/830mm
Delivery February 2005
Implementation June 2005
Haste lockage (Osnabrück branch canal, Lower Saxony)
4 sluice gate drives 40kN/700mm
Delivery December 2004
Implementation May 2005
Hollage lockage (Osnabrück branch canal, Lower Saxony)
4 sluice gate drives 40kN/700mm
Delivery December 2004
Implementation May 2005
Tiergartenschleuse Oranienburg lockage (Brandenburg)
Drive Fishbellied flaps 165kN/2200mm
Delivery November 2004
Implementation April 2005
Rathenow weir system (Brandenburg)
4 drives, Fishbellied flaps 800kN/3500mm
Delivery March 2006
Implementation June 2006
Templin lockage (Upper Havel - waterway, Brandenburg)
Head gate/Aft gate
4 Mitred gate drives 30kN/1530mm
4 slide gate drives 10kN/850mm
Delivery October 2004
Implementation September 2005
Hamm lockage (Datteln-Hamm-Canal, North Rhine-Westphalia)
5 Mitred gate drives UH/LH 110kN/2300mm
2 slide gate drives LH 60kN/2000mm
2 cylindrical sluice drives UH 100kN/800mm
2 abutment beam drives LH 100kN/3450mm
4 abutment beam locking actuators 8kN/190mm
Delivery September 2004
Implementation October 2004
Lockage in Hamm - Werries (Datteln-Hamm-Canal, North Rhine-Westphalia)
6 Mitred gate drives UH/LH 190kN/2400mm
Delivery September 2004
Implementation October 2004
Hannover-Linden lockage
1 Flap gate drive Upper head 140kN/6050mm
Delivery May 2004
Implementation June 2004
Eldena weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
2 drives Fishbellied flaps 425kN/4645mm
Delivery June 2004
Implementation August 2004
Kleine Spree Niedergurig weir system (Brandenburg)
Drive Fishbellied flaps 120kN/2100mm
Delivery May 2004
Implementation May 2004
Krummesse lockage (Elbe-Lübeck-Canal, Schleswig-Holstein)
Aft gate
2 Mitred gate drives 80kN/2000mm
Delivery February 2004
Implementation March 2004
Neustadt-Glewe lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
Aft gate/Head gate
4 Mitred gate drives UH/LH 30kN/1530mm
4 sluice gate drives UH/LH 28kN/950mm
Delivery February 2004
Implementation April 2004
Horkheim lockage (Neckar, Baden Württemberg)
Head gate/left and right chamber
2 hook gate drives 120kN/7200mm
Delivery August 2004
Implementation September 2004
Berlin “Unterschleuse“ lockage (Landwehr canal, Berlin)
Head gate/Aft gate
4 Mitred gate drives 80kN/1610mm
8 slide gate drives 22kN/890mm
Delivery February 2004
Implementation April 2004
Lower Ucker lake weir system (Brandenburg)
Drive Fishbellied flaps 140kN/2110mm
Delivery December 2003
Implementation August 2004
Liepe weir system (Finow canal, Brandenburg)
Drive Fishbellied flaps 340kN/3770mm
Delivery February 2004
Implementation June 2004
Stecher weir system (Finow canal, Brandenburg)
Drive Fishbellied flaps 340kN/3770mm
Delivery February 2004
Implementation June 2004
Zillisheim lockage no. 35 (Canal du Rhone au Rhin, France)
Aft gate/Head gate
4 Mitred gate drives 20kN/1200mm
2 flap gate drives LH 2000Nm/90°
2 circulation sluice drives UH 55kN/1230mm
Delivery November 2003
Implementation 2004
Zillisheim lockage no. 34 (Canal du Rhone au Rhin, France)
Aft gate/Head gate
4 Mitred gate drives 20kN/1200mm
2 flap gate drives LH 2000Nm/90°
2 circulation sluice drives UH 55kN/1230mm
Delivery November 2003
Implementation 2004
Illfurth lockage no. 33 (Canal du Rhone au Rhin, France)
Aft gate/Head gate
4 Mitred gate drives 20kN/1200mm
3 slide gate drives LH 55kN/430mm
2 circulation sluice drives UH 55kN/1230mm
Delivery November 2003
Implementation 2004
Jettenbach barrage (Inncanal, Bavaria)
Channel inlet
5 x 2 coupled sluice drives 2 x 80kN/4575mm
Delivery September 2003
Implementation October 2003
Neckarzimmern lockage (Neckar, Baden Württemberg)
Head gate/left chamber
2 Mitred gate drives 300kN/1800mm
2 Segment gate drives 140kN/420mm
Delivery November 2003
Implementation June 2004
Lower lock Minden lockage (connection channel from south, Minden – Lower Saxony)
2 Mitred gate drives LH 120kN/3000mm
2 cylindrical sluice drives LH 40kN/700mm
4 cylindrical sluice drives UH 40kN/700mm
1 Flap gate drive UH 157kN/5500mm
Delivery September 2003
Implementation December 2003
Kummersdorf weir system (Storkower water, Brandenburg)
1 weir shutter drive 20kN/1130mm
Delivery July 2003
Implementation July 2003
Storkow weir system (Storkower water, Brandenburg)
1 weir flap drive 120kN/2300mm
Delivery May 2003
Implementation July 2003
Neu Kaliß weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
2 drives 4m - Fishbellied flaps 175kN/4100mm
Delivery Marz 2003
Implementation July 2003
Prieros lockage (Dahme-waterway, Brandenburg)
Aft gate/Head gate
4 Mitred gate drives UH/LH 15kN/1450mm
4 sluice gate drives UH/LH 15kN/1450mm
Delivery February 2003
Implementation June 2003
Grabow lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
Aft gate/Head gate
4 Mitred gate drives UH/LH 30kN/1530mm
4 sluice gate drives UH/LH 28kN/950mm
Delivery February 2003
Implementation March 2003
South lock chamber of Kersdorf lockage (Oder-Spree-Canal, Brandenburg)
Upper head
2 cylindrical sluice drives 50kN/360mm
Delivery December 2002
Implementation February 2003
Schleusenanlage Storkow (Storkower waters, Brandenburg)
Head gate/Aft gate
4 Mitred gate drives 50kN/1530mm
4 slide gate drives 20kN/920mm
Delivery November 2002
Implementation March 2003
Schorfheide lockage (Upper Havel - waterway, Brandenburg)
Head gate/Aft gate
4 Mitred gate drives 30kN/1530mm
4 slide gate drives 10kN/850mm
Delivery November 2002
Implementation March 2003
City mill Perleberg weir system (Brandenburg)
1 drive Fishbellied flaps 160kN/2110mm
Delivery September 2002
Implementation December 2002
Wolfswinkel weir system (Finow canal, Brandenburg)
1 drive Fishbellied flaps 200kN/3475mm
Delivery August 2002
Implementation September 2002
Eglingen lockage no. 25 (Canal du Rhone au Rhin, France)
Aft gate/Head gate
4 Mitred gate drives 20kN/1200mm
2 flap gate drives LH 2000Nm/90°
2 circulation sluice drives UH 55kN/1230mm
Delivery October 2002
Implementation 2003
Eglingen lockage no. 24 (Canal du Rhone au Rhin, France)
Aft gate/Head gate
4 Mitred gate drives 20kN/1200mm
3 slide gate drives LH 55kN/430mm
2 circulation sluice drives UH 55kN/1230mm
Delivery October 2002
Implementation 2003
Hagenbach lockage no. 23 (Canal du Rhone au Rhin, France)
Aft gate/Head gate
4 Mitred gate drives 20kN/1200mm
2 flap gate drives LH 2000Nm/90°
2 circulation sluice drives UH 55kN/1230mm
Delivery October 2002
Implementation February 2003
Heidelberg lockage (Neckar, Baden-Württemberg)
Head gate/Aft gate right chamber
4 Mitred gate drives 300kN/1800mm
4 Segment gate drives 140kN/420mm
Delivery March 2004
Implementation May 2004
Heidelberg lockage (Neckar, Baden-Württemberg)
Head gate/Aft gate left chamber
4 Mitred gate drives 300kN/1800mm
4 Segment gate drives 140kN/420mm
Delivery May 2002
Implementation April 2003
Havelberg lockage (Lower Havel / Brandenburg)
Upper head/Lower head
4 Mitred gate drives 125kN/3000mm
4 circulation sluice drives 125kN/3000mm
Delivery March 2003
Implementation July 2003
Barkow lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
Aft gate/Head gate
2 Mitred gate drives LH 30kN/1530mm
2 slide gate drives LH 28kN/950mm
2 slide gate drives UH 28kN/950mm
1 flap gate drive UH 90kN/2400mm
Delivery February 2002
Implementation April 2002
Heidwiller lockage no. 29 (Canal du Rhone au Rhin, France)
Aft gate/Head gate
4 Mitred gate drives 20kN/1200mm
3 slide gate drives LH 55kN/430mm
2 circulation sluice drives UH 55kN/1230mm
Delivery October 2001
Implementation September 2002
Valdieu-Lutran lockage no. 2 north (Canal du Rhone au Rhin, France)
Aft gate/Head gate
4 Mitred gate drives 20kN/1200mm
3 slide gate drives LH 55kN/430mm
2 circulation sluice drives UH 55kN/1230mm
Delivery December 2001
Implementation April 2002
Heidwiller lockage no. 28 (Canal du Rhone au Rhin, France)
Aft gate/Head gate
4 Mitred gate drives 20kN/1200mm
3 slide gate drives LH 55kN/430mm
2 circulation sluice drives UH 55kN/1230mm
Delivery October 2001
Implementation June 2002
Brunstatt lockage no. 36 (Canal du Rhone au Rhin, France)
Aft gate/Head gate
4 Mitred gate drives 20kN/1200mm
3 slide gate drivee LH 55kN/430mm
2 ciruclation sluice drives UH 55kN/1230mm
Delivery October 2001
Implementation December 2001
Regow lockage (Upper Havel - waterway, Brandenburg)
Head gate/Aft gate
4 Mitred gate drives 30kN/1530mm
4 slide gate drives 10kN/850mm
Delivery November 2001
Implementation March 2002
Zehdenick lockage (Upper Havel - waterway, Brandenburg)
Upper head/Lower head
4 Mitred gate drives 110kN/2000mm
Delivery November 2001
Implementation March 2002
Schwedt lockage (“Schwedter Querfahrt“ / Brandenburg)
Upper head/Lower head
4 Mitred gate drives 110kN/2000mm
4 flap gate drives 20kN/850mm
Delivery November 2001
Implementation December 2001
Hannover-Linden lockage (west side)
1 roll wedge drive, lower head 200kN/2050mm
1 circulation cylindrical sluice 100kN/1250mm
1 saving basin cylindrical sluice 100kN/1250mm
Delivery October 2001
Implementation December 2001
Grütz lockage (lower Havel / Brandenburg)
Upper head/Lower head
4 Mitred gate drives 80kN/2000mm
4 circulation sluice drives 80kN/2000mm
Delivery October 2001
Implementation November 2001
Märkisch Buchholz weir system (Brandenburg)
Flap drive 0.9m x 12m 290kN/1800mm
Delivery October 2001
Implementation February 2002
South lock chamber of Fürstenwalde lockage (Oder-Spree-Canal, Brandenburg)
Upper head/Lower head
4 circulation sluice drives 50kN/1750mm
Delivery May 2001
Implementation June 2001
Büssau weir system (Elbe-Lübeck-Canal, Schleswig-Holstein)
2 Drive 6m - Fishbellied flaps 300kN/3450mm
Delivery August 2001
Implementation December 2001
Hannover-Linden lockage (east side)
1 roll wedge drive, lower head 200kN/2050mm
1 circulation cylindrical sluice 100kN/1250mm
1 saving basin cylindrical sluice 100kN/1250mm
Delivery March 2001
Implementation April 2001
Garwitz lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
Head gate/Aft gate
4 Mitred gate drives 30kN/1530mm
4 slide gate drives 28kN/950mm
Delivery January 2001
Implementation April 2001
Zaaren lockage (Upper Havel - waterway, Brandenburg)
Head gate/Aft gate
4 Mitred gate drives 30kN/1530mm
4 slide gate drives 10kN/850mm
Delivery January 2001
Implementation April 2001
Neckarzimmern lockage (Neckar, Baden-Württemberg)
1 compound drive 100kN/2950mm
Delivery December 2000
Implementation February 2001
“Large lock Flaesheim“ lockage (Wesel - Datteln Canal / Nordrhein - Westfalen)
Lower head
2 abutment beam drives 110kN/1500mm
Delivery November 2000
Implementation March 2001
“Small lock Flaesheim“ lockage (Wesel - Datteln Canal / Nordrhein - Westfalen)
Lower head
2 abutment beam drives 110kN/1500mm
Delivery November 2000
Implementation February 2001
Hesselte lockage (Dortmund - Ems Canal / Nordrhein - Westfalen)
Lower head
2 abutment beam drives 55kN/2160mm
Delivery November 2000
Implementation February 2001
Venhaus lockage (Dortmund - Ems Canal / Nordrhein - Westfalen)
Lower head
2 abutment beam drives 55kN/1870mm
Delivery November 2000
Implementation February 2001
Rodde lockage (Dortmund - Ems Canal / Nordrhein - Westfalen)
Lower head
2 abutment beam drives 55kN/1590mm
Delivery November 2000
Implementation February 2001
Neukölln lockage (Neuköllner ship canal / Berlin)
Head gate/Aft gate
4 Mitred gate drives 200kN/1520mm
Delivery November 2000
Implementation April 2001
Offenbach small lock lockage (Main; Hessen)
Head gate
1 Flap gate drive 340kN/850mm
Delivery May 2000
Implementation December 2000
Plötzensee lockage (Berlin-Spandauer shipping canal, Berlin)
Aft gate/Head gate north chamber
2 Mitred gate drives LH 120kN/2000mm
2 Segment gate drives LH 35kN/1000mm
2 Segment gate drives UH 35kN/1000mm
1 Flap gate drive UH 150kN/5500mm
Delivery June 2000
Implementation August 2000
Neuburg lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
Aft gate/Head gate
2 Mitred gate drives LH 30kN/1530mm
2 slide gate drives LH 28kN/950mm
2 slide gate drives UH 28kN/950mm
1 Flap gate drive UH 90kN/2400mm
Delivery February 2000
Implementation April 2000
Hessigheim lockage (Neckar, Baden-Württemberg)
1 compound drive 100kN/2950mm
Delivery November 1999
Implementation March 2000
Bannetze lockage (Aller, Lower Saxony)
Upper head/Lower head
4 circulation sluice drives 40kN/1850mm
Delivery November 1999
Implementation January 2000
Griesheim small lock lockage (Main; Hessen)
Head gate/Aft gate
2 cheek gate drives 54kN/1530mm
2 slide gate drives 14kN/530mm
Delivery August 1999
Implementation August 2000
Guttenbach lockage (Neckar, Baden-Württemberg)
Head gate left chamber
2 Mitred gate drives 300kN/1800mm
2 Segment gate drives 140kN/420mm
1 compound drive 100kN/2950mm
2 cable end locks 10kN/60mm
Delivery July 1999
Implementation October 1999
Himmelpfort lockage (Lychener waters, Brandenburg)
Head gate/Aft gate
4 Mitred gate drives 30kN/1530mm
4 slide gate drives 10kN/850mm
Delivery March 1999
Implementation April 1999
Dömitz barrage (Dove Elbe, Mecklenburg-Western Pomerania)
Outlet structure
4 Mitred gate drives 30kN/1500mm
Delivery June 1999
Implementation October 1999
Woltersdorf lockage (Rüdersdorfer waters / Berlin)
Head gate/Aft gate
4 Mitred gate drives 120kN/2000mm
4 Segment gate drives 30kN/450mm
1 bascule bridge top bolt 10kN/250mm
Delivery February 1999
Implementation June 1999
Güritz lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
Aft gate
2 Mitred gate drives 30kN/1530mm
2 roll wedge drives 10kN/950mm
2 locking actuators for lifting gate 10kN/30mm
Delivery January 1999
Implementation May 1999
Dörpen lockage (Coastal, Lower Saxony)
2 circulation sluice drives 45kN/1550mm
2 drainage sluice drives 45kN/1550mm
Delivery July 1998
Implementation September 1998
Dömitz weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
2 drives 7m - Fishbellied flaps 330kN/3800mm
1 drives 3m - Fishbellied flaps 180kN/4700mm
1 cheek gate drive 35kN/1830mm
1 cheek gate flood-control sluice 15kN/565mm
2 fishway sluice drives 20kN/1300mm
1 intake structure sluice drive 20kN/1300mm
Delivery July 1998
Implementation January 1999
Rosenbeck lockage (Werbellin canal, Brandenburg)
Head gate/Aft gate
4 Mitred gate drives 30kN/1530mm
4 roll wedge drives 10kN/850mm
Delivery March 1998
Implementation April 1998
New mill (Dahme waterway, Brandenburg)
Head gate/Aft gate
4 Mitred gate drives 30kN/1800mm
4 roll wedge drives 12kN/800mm
Delivery February 1998
Implementation April 1998
Heilbronn lockage (Neckar, Baden-Württemberg)
both Aft gates/left and right chamber
4 Mitred gate drives 300kN/1800mm
4 Segment gate drives 140kN/420mm
1 compound drive 100kN/2950mm
2 cable end locks 10kN/60mm
Delivery April 1998
Implementation July 1998
Dörverden lockage (Mittelweser, Lower Saxony)
Aft gate
4 roller sluice drives 100kN/1200mm
Delivery October 1997
Implementation December 1997
Neu Kaliß lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
Head gate/Aft gate
4 Mitred gate drives 30kN/1530mm
4 roll wedge drives 10kN/800mm
Delivery October 1997
Implementation April 1998
Hamm – Werries lockage (Datteln-Hamm Canal, North Rhine-Westphalia)
4 circulation sluice drives 120kN/2400mm
Delivery October 1997
Implementation December 1997
Rathenow city lock lockage (Havel, Brandenburg)
Head gate/Aft gate
4 Mitred gate drives 45kN/2000mm
4 Segment gate drives 23kN/300mm
Delivery April 1997
Implementation May 1997
Hirschhorn lockage (Neckar, Hessen)
Head gate/left chamber
2 Mitred gate drives 300kN/1800mm
2 Segment gate drives 140kN/420mm
Delivery May 1997
Implementation June 1997
Horkheim lockage (Neckar, Baden-Württemberg)
1 compound drive 100kN/2950mm
Delivery August 1996
Implementation September 1996
Hofen lockage (Neckar, Baden-Württemberg)
1 compound drive 100kN/2950mm
Delivery August 1996
Implementation September 1996
Bad Cannstatt lockage (Neckar, Baden-Württemberg)
1 compound drive 100kN/2950mm
Delivery August 1996
Implementation September 1996
Rathenow city lock lockage (Havel, Brandenburg)
1 segment gate drive, aft gate 23kN/300mm
Delivery May 1996
Implementation July 1996
Lübz lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
2 Mitred gate drives Aft gate 30kN/1530mm
2 slide gate drives, aft gate 10kN/820mm
2 bell sluice drives head gate 10kN/500mm
Delivery March 1996
Implementation May 1996